I lead programs across functions from concept through production: planning the work, managing scope, budgets, schedules, resources, and technical risk, and getting engineering, quality, suppliers, clinical partners, and manufacturing pulling the same way.
Cross-functional leadership
At Abiomed, part of Johnson & Johnson MedTech, I lead technical strategy for a multi-million-dollar, FDA-committed supplier transition for peel-away introducer kits. The work spans nine functional organizations and three introducer platforms developing in parallel, so a big part of my role is keeping those groups aligned on one plan while keeping the demand on internal resources low.
That reaches outside the company too: I defined a clinical workflow and human factors study across academic and community healthcare settings, wrote the RFP, and evaluated research proposals so clinical insight feeds directly into user needs and risk.
Evidence: Abiomed peel-away introducer program
Project planning
Good programs are planned for success. At Abiomed I authored the design and manufacturing plans, planning reviews, and business rationales for the introducer program, and led gap assessments that set the order of technical risks and testing.
My plans start from risk: break a large problem into small tasks, put the riskiest questions first, and make the trade-offs visible to everyone who depends on the schedule.
Evidence: Abiomed program plans and gap assessments; Goddard program management
Leading engineering teams
At Goddard Technologies I led the mechanical engineering development of a next-generation robotic validation system across two machine iterations and five years. In Phase II I led an 11-engineer team, running mechanical execution within a $3M budget on a program that exceeded $5M in total investment. The production system reached 98% machine throughput.
I led while still designing. I held technical oversight of every module and owned the detailed design of three sub-assemblies myself: the dynamometer, including an original gearbox; the machine base, which I took the risk of redesigning from the ground up for better modularity, cost, and bed height; and the gantry adjustment mechanism that reconfigures the system for each robot under test and for maintenance.
Along the way I've mentored more than 10 engineers. I do my best work on energetic, dynamic teams who care about what they're building.
Evidence: Goddard robotic validation system; Goddard consulting
Supplier and manufacturing development
I've researched, launched, and managed new contract manufacturers in regulated and competitive industries. At Abiomed I direct the technical side of a supplier transition: selecting among six contract manufacturers, writing the technical RFPs, scoring five finalists on a weighted Pugh matrix, and assessing molding, silicone processing, and adhesive bonding capabilities.
At Thermo Fisher Scientific I set up a local line for Alpha/Beta builds of the Orion Star T900 and then transferred production to a partner facility in Singapore. Earlier, I wrote the motor specification for the Shark NV680, managed custom-component suppliers for the T900, and ran second-supplier tooling qualification at Amphenol.
Evidence: Abiomed introducer program, Orion Star T900, Shark NV680, Amphenol PCD
Risk, design controls, and quality
Successful launches are honest about risk and strategic about mitigation. In regulated work that means design control and traceability frameworks that link user needs, requirements, risk management, V&V, and supplier qualification, plus gap assessments that decide which risks and tests come first.
I've also worked through product recalls. That experience is a big part of why I plan for success from the start, using DFMEA, root cause analysis, and verification testing.
Evidence: Abiomed design controls, Goddard root cause investigations, Orion 7070iX
Collaboration across disciplines
On the Orion Star T900, I partnered with industrial design to pilot Thermo Fisher Scientific's new design language. At SharkNinja I worked closely with industrial design and marketing, tracking project progress and risk on a small team that delivered six products with over $1B in combined annual revenue.
Evidence: Orion Star T900, Shark NV650 / NV680 / NV600
Program scale and pace
At Hasbro, as an Associate Project Engineer, I managed about 50 Star Wars and Transformers SKUs at once from concept through production. It was a fast-paced, efficient environment where people got an impressive amount done and had a great time doing it.
At Shark I learned to be creative and fast, and that innovation can be a goal and a priority when the work is hard and focused.
Evidence: Hasbro action figures, SharkNinja